Download Wenger 72944 Specifications
Transcript
Section 9 Summary of Coordination and Environmental Compliance Act will also be required for the construction (non-point source runoff) of project features. This program has been delegated by the U.S. Environmental Protection Agency for implementation to FDEP. NPDES permits for construction of project features under the Acceler8 program prior to Federal approval and authorization of the Selected Plan for the federal EAA Storage Reservoir will be the responsibility of SFWMD. At this time, it is not envisioned that an NPDES permit will be required for the operation of the EAA Storage Reservoir Project, as the project does not involve treatment or the discharge of pollutants. Depending upon the schedule for obtaining Federal review and approval of the project, USACE will obtain the necessary permits to construct and perform initial operational testing and verification of remaining project features. The cost and schedule for obtaining the necessary permits are included in the project management plan. 9.6 COMPLIANCE WITH FLORIDA STATUTES AND VIEWS OF NONFEDERAL SPONSOR SFWMD will be responsible for obtaining permits required by the State of Florida in accordance with Chapters 373 and 403 of the Florida Statutes. Depending upon the schedule for obtaining Federal review and approval of the project, USACE will obtain the necessary permits to construct and perform initial operational testing and verification of remaining project features. The cost and schedule for obtaining the necessary permits are included in the project management plan. 9.6.1 Clean Air Act of 1972 The existing air quality within South Florida is considered good. Additionally, the region meets current National Ambient Air Quality Standards, a condition requisite for its declaration as a “nonattainment area” (PBC Amb. Mon. Group, 2004). The only potential source of air pollution would be from pump station(s). Pursuant to rule 62-210.300(3)(a)(21)(b), operations staff will be required to determine if stations will be exempt from air permitting or if an air general permit will be required. This project has been and will continue to be coordinated with U.S. Environmental Protection Agency for compliance with Section 309 of the Act. A Title V Source air permit application will be submitted to the Environmental Health and Engineering Section of the County's Department of Health prior to construction. 9.6.2 Clean Water Act of 1972 All State water quality standards will be met. A Section 404 (b)(1) evaluation is included in Annex B of the Revised Draft PIR/EIS. The Water Quality EAA Storage Reservoirs Revised Draft PIR and EIS 9-6 February 2006
Related documents
User Manual - Chinavasion
Multiquip LS600P User's Manual
xpdm new man.book - ABLE Instruments & Controls
COSA Instrument XPDM Dew Point Meter User Guide
Bedienungsanleitung Schneefräse 5,5 PS Wichtig:
National Instruments 1128 User's Manual
SCXI-1129 User Manual - National Instruments
15010 General Provisions For Mechanical Work