Download T ` I I
Transcript
iriis docun'lent GEOTECHNICAL SERVICES irr nalrrra s:Jret. anii si.'a;( d ri;rc t' nir t. Basis for . .:'. .: -:i. Recommendations The recommendations and conclusions coniained I Is preliminary -.a-l :- _ _r -, ,i:_ ^ in this report are based on ihe borings drilled and in material propert'res overthefite., tests performed. We would point outthatthere may be variations differseriouslyfrornthbde andwould cautionthatthere maybe unknown conditions in existencewhich at all, cannot be' and havd nbt encountered by the test borings. Such conditions, if indeed they exist and conclusiohs been, accounted for in this report. Therefore, the descriptions, recommendations, only to the immediate vicinity ofthe coniained herein should be considered as generalized, applylng borings. design, the finalized soil and Since this report is being prepared in advance of much of the deiailed system and loading' vertical sfucture parameters (i.e., floor elevaiion, fill and cut provisions, structural preparation of this report' movementtolerance, etc.) may differfrom the ones considered duringthe requestthe opportunityto revierrythe! lf such a designvariance is substantial, standardTestingwould inthis plansand speciftcations of the proposed facilityforapplicabilitytothe soilconditions assuran@ of consistency with its rep"t"ij$ . .:rilil / intent. : . It is recommended i.tiltii ,.:,iLir:,.!jj:: earthwork and that Standard Testing be retained fortesting and observation during foundationconstructionphases,iohelpdeterminethatthedesignrequirementsarefulfilled' li:9?l?,: the pier drilling operationst recommended that Standard Testing's pier inspector be present during of embedment veriry the hardness of the support soil stratum and the proper depth -o application tothe project This report has been prepared forthe exclusive use of our6lientforspecific geotechnical pT"l*: discussed, and has been prepared in accordance with generally accepted I I I t I I I I I t I I I I I T Project No. 0309-3097 11 I