Download Service instructions
Transcript
CR(E) 45 CR(E) 45-1-1 CR(E) 45-1 CR(E) 45-2-2 CR(E) 45-2 CR(E) 45-3-2 CR(E) 45-3 CR(E) 45-4-2 CR(E) 45-4 CR(E) 45-5-2 CR(E) 45-5 CR(E) 45-6-2 CR(E) 45-6 CR(E) 45-7-2 CR(E) 45-7 CR(E) 45-8-2 CR(E) 45-8 CR(E) 45-9-2 CR(E) 45-9 CR(E) 45-10-2 CR(E) 45-10 CR(E) 45-11-2 CR(E) 45-11 CR(E) 45-12-2 CR(E) 45-12 CR(E) 45-13-2 CR(E) 64 96397558 96397559 96397560 96307228 96397561 96307229 96397562 96307230 96397563 96397564 96397565 96397566 96397567 96397568 96397569 96397570 96397571 96397572 96397573 96397574 96397575 96397576 96397577 96397578 96397579 CR(E) 64-1-1 CR(E) 64-1 CR(E) 64-2-2 CR(E) 64-2-1 CR(E) 64-2 CR(E) 64-3-2 CR(E) 64-3-1 CR(E) 64-3 CR(E) 64-4-2 CR(E) 64-4-1 CR(E) 64-4 CR(E) 64-5-2 CR(E) 64-5-1 CR(E) 64-5 CR(E) 64-6-2 CR(E) 64-6-1 CR(E) 64-6 CR(E) 64-7-2 CR(E) 64-7-1 CR(E) 64-7 CR(E) 64-8-2 CR(E) 64-8-1 CR(E) 90 96397580 96397581 96397582 96397583 96397584 96397585 96397586 96397587 96307231 96397588 96397589 96397590 96397591 96397592 96397593 96397594 96397595 96397596 96397597 96397598 96397599 96397600 CR(E) 90-1-1 CR(E) 90-1 CR(E) 90-2-2 CR(E) 90-2 CR(E) 90-3-2 CR(E) 90-3 CR(E) 90-4-2 CR(E) 90-4 CR(E) 90-5-2 CR(E) 90-5 CR(E) 90-6-2 CR(E) 90-6 96397601 96397602 96397603 96397604 96397605 96307232 96397606 96397607 96397608 96397609 96397610 96397611 Table 6 “Pump Data” GSC files 2. Select the file from the ‘Configuration files’ field, and press ‘Send’. 3. Check that the selected configuration file number is now shown in the label in the PC Tool, Standard Configuration under ‘5.Pump Data’, indicating that the CU 351 has received and stored the file. See fig. 19. 96307032 2. C-MPC options 96592488 3. Hydro MPC 96307209 4. H-MPC options 5. Pump data 96592497 96307221 CONFIGURATION STEPS - PLEASE FOLLOW THE NUMBERS 96586126 TM04 2155 2108 1. Control MPC Fig. 19 “Pump data” on GSC files label 4. Restart the CU 351 unit by pressing, “Restart” in the right bottom of the PC Tool. Note When “Restart” is pressed, the CU 351 will initialise. A progress bar indicating how far the initialisation is in per cent appears in the display. This procedure will take about 25 sec. 5.2.3 Configuration of external frequency converters, if any The manufacturer's factory settings of the external frequency converter(s) used in MPC F, EF and EDF must be changed to the Grundfos settings before the MPC is ready for test. To configure the external frequency converter: 1. Turn on the power supply to the frequency converter(s) by means of the automatic circuit breaker. 2. For each frequency converter, do the settings as described in the table below. 41 / 47