Operation
Transport the centrifuge only in the
upright position using the special
box provided with the instrument
and secure it properly. Place the
centrifuge carefully.
Before using the centrifuge, make sure that
the transport protection has been removed!
In order to allow the coolant to settle
down in the compressor, the
instrument must be left idle at the
new location for about ½ to 1 hr.
The Biofuge fresco is now ready for use.
Make sure that your mains voltage and frequency
match the specifications on the instrument. Turn off the
mains switch on the lower right of the instrument (push
down the "0" marking), then connect the instrument to
the mains supply.
Turn on the mains switch
on the lower right (see figure)
mains switch
For a couple of seconds the following reading appears
in the control panel:
This tells you that the
instrument carries out
an internal check of its
software.
After a couple of seconds the display changes. The
values now shown are (except for the temperature) the
ones last used. The temperature reading gives the
current temperature of the sample (before the start
normally the temperature of the rotor chamber).
17
!
Transport and installation
Mains connection
#$ !
%# "
& ""
'$
()
%&