Download Spitfire - Spectra
Transcript
The Spitfire Beam Path Spitfire USF Stretcher and Compressor The layout of the Spitfire USF is identical to that of the Spitfire F. The only difference is that the grating ruling density is reduced in the Spitfire USF to accommodate its shorter pulses (and, therefore, broader spectral bandwidth). The gratings are also set at a different angle to the beam. Spitfire P Stretcher and Compressor The narrower spectrum of picosecond pulses (as compared to femtosecond pulses) requires greater dispersive power from the gratings in order to adequately reduce the peak power of these pulses before they can be safely amplified. Therefore, the Spitfire P uses gratings with an increased ruling density, compared to that used on the Spitfire F, and set at a different angle to the beam. In addition, the stretcher and compressor incorporate additional folding mirrors to increase the length of the beam path and give the separated wavelengths adequate distance to separate and recombine spatially. Figure 7-4 illustrates the stretcher and compressor beam path for picosecond operation. Note For clarity, the dispersion of the beam is not shown in the same detail in Figure 7-4 as in the other stretcher/compressor figures. Stretcher Grating VRR M2 M3 HRR Fold Mirror VRR M1 Retro Mirror Amplified Pulse Compressor Grating Figure 7-4: Modifications for the Spitfire P Spitfire PM Stretcher and Compressor The picomask version of the Spitfire is identical to the Spitfire F, except that it uses the same gratings as the picosecond amplifier, and a special mask aperture is added to the stretcher cavity to reduce the bandwidth of the femtosecond seed pulses. The Spitfire PM does not require the extra path length in the stretcher and compressor that is needed by the Spitfire P. This mask and its position in the stretcher in front of M1 are shown in Appendix B, “Changing To and From PicoMask Operation,” which provides instructions for converting Spitfire F and Spitfire USF femtosecond models to and from picomask operation. 7-5