Download ADA100 accessible hand pump

Transcript
TABLE OF CONTENTS
page 2
Introduction
3
Section 1: How We Shipped the ADA100
4
Section 2: Inspecting the Existing System / Removal of Old Pump
4
Section 3: Replacing The Existing Well Cover.
5
Section 4: Pump Cylinder, Drop Pipe Installation.
5
Section 5: Pump Head Installation.
7
Section 6: Pumping Water. Finishing Touches
9
© Simple Pump Company