Download User Manual P/n: RAB108E
Transcript
Maintenance & Troubleshooting .Replacement procedures Fig. 7–8 Reagent priming 2.1.3. Waste container replacement Unscrew the waste container cap. Replace waste container according to your laboratory’s protocol. Close the empty container with the cap and dispose of waste liquids according to your local\national organizations. 2.2. Optical bench lamp replacement 2.2.1. Lamp replacement Wait for the lamp to cool down before handling it. Power off the instrument. Open the instrument left-hand and right-hand side panels, lift the top cover of the instrument as well (see 3. Instrument panels & cover Removals, page 7-18). Locate the Optical bench at the top left of the instrument ( (see Fig. 7–9, page 7-12). Pentra 80 - User Manual - RAB108E 7–11