Download C-ET Installation Guide
Transcript
3.3c Installing the Fixture During this procedure you will be required to place the fixture and transducers on the pipe more than once, and in some cases, as many as 3 times. The fixture and transducers are placed on the pipe temporarily to mark where the fixture and transducers make contact with the pipe so those sections can be cleaned. Use the steps below to begin installation: 1. Remove any pipe insulation from the installation site. Note: Make sure you clear an area that is large enough for the transducers’ installation. 2. Disassemble the fixture by removing the four nuts from the threaded rods and pulling apart the two halves of the fixture. Note: Make note of the assembled fixture to make sure you reassemble it the same way. Otherwise, the transducer spacing will be incorrect. Top View C-ET Ultrasonic Flow Transducer System Installation Guide 17