Download Chapter 8 Launch Operations

Transcript
LM-2E USER’S MANUAL
CHAPTER 8
CALT'S PROPRIETARY
9
-5 minutes
10
-60 seconds
11
12
13
-30 seconds
-7 seconds
0 seconds
On-board Telemetry and Tracking Systems Power-on
Telemetry, Tracking and Propellant Utilization Systems Power
Switch-over;
Control System Power Switch-over;
Control System, Telemetry System and Tracking System
Umbilical Disconnection;
Moving Back the Cable Swing Arms;
TT&C Systems Starting;
Camera on;
Ignition.
A8.6 Post-launch Activities
The orbital parameters of the injected orbit will be provided to Customer in half-hours
after SC injection.
The launch evaluation report will be provided to the Customer in a month after
launch.
Issue 1999
8-9