Download Serial Code Prefix ABO & onwards
Transcript
28 Commissioning and Testing A. Electrical Installation B.Gas Installation 1. Checks to ensure electrical safety should be carried out by a competent person. 1. The whole of the gas installation, including the meter, should be inspected and tested for tightness and purged in accordance with the recommendations of BS. 6891. 2. Always carry out the preliminary electrical system checks, i.e. In IE refer to IS.813:2002. earth continuity, polarity, resistance to earth and short circuit, using a suitable test meter. 2. Purge air from the gas installation by the approved methods only. 3. After wiring the boiler, all grommets in the bottom panel MUST be in place to ensure that the boiler case sealing is maintained. WARNING. Whilst effecting the required gas tightness test and purging air from the gas installation, open all windows and doors, extinguish naked lights and do not smoke. General Please Note: The combustion for this appliance has been checked, adjusted and preset at the factory for operation on the gas type defined on the appliance data plate. Do not adjust the air/gas ratio valve. Having checked: - That the boiler has been installed in accordance with these instructions. - The integrity of the flue system and the flue seals, as described in the Flue Installation section. Proceed to put the boiler into operation as follows: Check the operational (working) gas inlet pressure CH Flow Set up the boiler to operate at maximum rate by DHW flow. Outlet opening hot tap to maximum With the boiler operating in the maximum rate condition check that the operational (working) gas pressure at the inlet gas pressure test point complies with the requirements - refer to “Gas Black Supply” on page 8. Handle Gas Supply DHW Inlet CH Return Yellow Ensure that this inlet pressure Handle can be obtained with all other gas appliances in the property Gas Pressure working. Test Point Blue Handle Black Handle Safety Drain Valve 3G9927 As part of the commissioning process, the combustion of this appliance must be checked and the Benchmark Checklist completed. A flow chart to assist is provided on page 63. ATTENTION ! IT IS A CONDITION OF THE MANUFACTURERS WARRANTY THAT THE BENCHMARK COMMISSIONING CHECKLIST IS FULLY COMPLETED AND LEFT WITH THE APPLIANCE Independent + Combi - Installation and Servicing 29 INSTALLATION INSTALLATION