Download GETTING STARTED
Transcript
TSS-Transport Simulation Systems October 2003 new one or open an existing one (C). If you then reopen the Control menu, you see that the Junctions... and Metering... options become accessible. If the Junctions... option is selected, a dialog window opens, with a list of the network junctions. 5.12.1 Junctions Junctions are selected by clicking on their id, listed in the dialog window. Figure 5-28: Adjusting traffic light timing The control plan for a selected junction is set up in the following way: Set the type of junction: Uncontrolled (traffic lights deactivated), Fixed (or pre-timed, traffic light timings with the values set in the control plan), External (only meaningful in combination with an external control plan implemented using the GETRAM Extensions of the GETRAM GETRAM v4.2 Getting Started 42