Download 1 The Kernel

Transcript
priority ISR’s. In order to execute the test, kernel should be compiled with
interrupt nesting enabled.
Provided by:
H8S/2674 variant
Test:
knmi.c
Description:
This test checks interrupt creation, configuration of NMI interrupt (rising
and falling edge) and execution of NMI ISR and DSR. This is an
interactive test and its building has to be enabled in configtool.
Provided by:
H8S/2674 variant
2.6.1 Running the eCos tests
2.6.1.1 Setting up connection
After
building
Configuration
the
Tool
tests,
also
the
facilitates
automatically downloading and running
the tests on the target hardware. To run
the tests using the Configuration Tool,
select Tools -> Run Tests. This brings
up the Run Tests dialog box. Prior to
running the tests, the method for
connecting to the target hardware is
selected. Clicking the Properties button
at the bottom of the Run Tests dialog
box brings up the Settings dialog box. If
you would like to use serial connection
then select Serial and setup Port and
Baudrate:
Installation and Testing
11