Download View the project brief
Transcript
TECHNICAL SUBMISSION SECTION C e. EMPLOYER’S REQUIREMENTS Collision Investigation Equipment During the life of this contract, the engineer adopting latest techniques and methods to monitor the accidents and collisions on the roads networks. Latest investigating tools and equipment shall be used in near future. The contractor shall be given opportunity to supply latest collision investigation equipment according to the requirement prevails with in PWA. A provisional sum is allocated for this equipment, which will be spent in coordination with the contractor. The list of equipment and the specification shall be issued to the contractor when these requirements become apparent within department. However, PWA reserves the right to not to procure any such tools or equipment or any item through this contract. 1.3 Scope Of Work The general activities to be undertaken are described below. The list is not exhaustive, the heavy vehicles / equipment may be engaged in the following activities including but not limited to Emergency Response to Incidents Safety and Emergency Repairs Roadway Inspection and Maintenance works Bridge Inspection Works Street Lighting Inspection & Repair Pothole Repairs Traffic Assistance for Lane Closures Medium / Heavy Lifting Services Clearing Operations after Incident/Accident Roads Operation and Maintenance Department (Roads O&M Dept.) of Assets Affairs (AA) of ASHGHAL is responsible to operate and maintain Roads (more than 24 m width) in the State of Qatar. Should the responsibility of department extend beyond above identified activities and scope the contractor should adopt the scope in fulfilling such responsibility. 1.4 Duration and location: The total duration of contract shall be for a period of 5 years. The contract shall price the rates for items as structured in Bills of Quantities in Section G. Through this contract PWA seeks commitment from the contractor for the five years duration. The equipment and machines required to be supplied on rental basis under regular pooling and auxiliary pooling are identified. The tenderer need to price the items accordingly. During the period of this contract no amendments to the rates shall be entertained. The vehicles are expected to work mainly within the Greater Doha area and from time to time in other part of the country. While the central mobilization point would be Assets Affairs Building in Doha, located on Salwa road near to fish market. AA-R 14/15 OM 042 C2 G On - Call Contract for Rental of Heavy Vehicles/Equipment C/3 March 2015