Download DWS-POE Install Guide - O

Transcript
Installation & User’s Manual for Predator
Whole Building UV Water Supply
DWS-POE
Next, locate the 24V Gray Transformer Box and remove the two screws that hold the front cover.
(see images below and at right). Unscrew the 3 machine screws on the POE’s front bracket and mount
the Transformer Box as shown in the image at right. Close the front cover and reinstall the two screws
that secure it.
Connect the two leads from the gray cable with red female push-on lugs to the two wires with male
push-on lugs from the black 24VAC solenoid.
Below is the wiring diagram from the 24V transformer box for remote
on/off control of the main water shutoff valve. (Please note that this
wiring is to be supplied by the customer on site).
Should the power ever go out and you wish to stop water flow to
unit, there is a small white manual override switch on the bottom
side of the black solenoid valve which will open or close the valve
manually (see image at right).