Download User Manual
Transcript
User Manual Edition July 2014 TEMPPO V6.1 Description of Use Figure 139 - Requirement analysis over several test suites: Detailed Data 3.1.5.6 Reporting TEMPPO Test Manager offers a reporting feature, which allows you to create flexible textual and graphical reports from your test structures and test suites. A test structure or test suite report can be created from any node within the structure, even from a single test case. Reports on current select node (root, TP, TC) in a test structure or test suite can be opened via the context menu Report selected. Reports of several test structures versions or test suites are called by the menu item Evaluation -> Progress charts. The following reports are possible: If a test structure is opened, reporting for test structure is opened via Evaluation > Report selected > Opened Test Structure. If a test structure is opened, reporting for more test suites is opened via Evaluation > Report selected > Several Test Suites. If a test suite is opened, reporting for test suite is opened via Evaluation > Report selected > Opened Test Suite. If a test structure is opened, reporting for more test suites is opened via Evaluation > Report selected > Several Test Suites. Different report settings can be defined for user level and for projects. In tab Personal settings, the user sees its own defined settings and in tab Project settings, all settings defined for this project are visible. Page 122