Download HS-G SERIES INSTALLATION & MAINTENANCE GUIDE
Transcript
Step 2 As illustrated below, wind the belt sling around the robot base two turns and make a knot on the side opposite to the power connector. <HSS-G> Step 3 Load the eyes of the belt sling on the hook of the crane. Wire (Belt sling) <Example of HSS-G series> Step 4 Remove the four bolts and release the robot unit from the pallet. Caution: When worker A is removing those bolts, worker B should support the robot unit as shown below to prevent it from overturning. <HSS-G> 7