Download to read User Manual & Installation Instructions
Transcript
Install manual Steam bathroom MODEL : WS-609P w w w . e a g l e b a t h. c om No advanced advice will be submit before we change our design and size. The pictures may be a little different from the real products. Our company keep the final explanation right. Do not dispose this product as unsorted municipal waste. Collection of such waste separately for special treatment is necessary. STEAM CONTROL Dear Guest, Thank you very much for purchasing our sanitary ware. To enable you to use this product safely and effectively, please read this installation and operation manual carefully before use. CAUTIONS STEAM CONTROL Self-clean system Step 2 Step 1 1.Please ensure that the product installed reliable electric leakage protection device, the power plug contains earth line, and make sure it is reliable earth line. Check the protect system of leakage protection each time before use. 2.Do not turn on water pump, heat pump or air bubble pump without water. 3.Before turn on water pump, check if the water level over jets 10 to 20 mm or not, make sure regular usage of water pump otherwise it will be destroy because of water leakage. 4.People with Hypertension symptom, after drink or heart disease are not allowed to use the bathtub. Children have a bath must under adult's guidance. 5.During use please noticed that don't blocked the jets and avoiding the air adjustment valve overflowing. Also keep the bathtub clean and don't let it blocked by hair or mess. 6.During use, please firstly adjust the water temperature or it will be burned. 7.The bathtub is designed with ergonomic, rise and fall changes are quite big so during usage pay more attention of be slipped. 8.Please shut down the system when not to use. TECHNIQUE PARAMETER Voltage Ac 1 10 V( ±10%) Frequency 60H Z Water Volatge 0.1~0.2Mpa Power of steam generator 2.65KW Power of water pump 1.0HP Power of heat pump 1KW Power of air pump Storage capacity Storage capacity 0.2KW 40gall on 0.18m3 CAUTIONS: Heat pump and air bubble pump is optional purchase. 01 WS-609P Step 3 Pour into cleaning liquid from here Step 4 Cleaning method : 1.C lean the steam engine regularly at least once by every 2weeks or after using 20 times. 2.Inject citric acid as main cleaning liquid,add 1.5L each time.after 10 minutes, turn on and When the system turns on, press “ ” button to start the steam function for about 30seconds and then shut down the system.After vent the stagnant water,repeat 2 or 3 times. 3.CAUTION: The system must be shut down before injecting WS-609P 16 Packing list Packing 1 2 p cs b lue c oat ed g las s + 2 pc s f ix ed do or wi th al um in um po le s a ro un d + 2 pcs m ova bl e doo r + ST RI PS Identification of components C ei l in g + b o tt o m tu b + s t ea m p ip e Packing 2 Packing 3 3 C on t ro l pa n el c ap ; Sh o we r , W h ee l w it h ca p , S ha m po o b o x , Dr a in e r c ap , T - pi l lo w , G la s s h an d ra i l , d o or H a nd e l , To w el h a nd l e , Se l f c le a n s y st e m , S c re w s , s oa p bo x 1 2 4 14 5 SCREW (1) M6x25 16pcs SCREW (2) M6x35 8pcs SCREW (3) 10pcs SCREW (4) St4x20 St4x25 SCREW (5) SCREW (6) ST4x16 M4x20 4pcs 14pcs 15 16 6 7 8 9 10 11 12 17 18 30pcs 13 1.Top shower 2. Exhaust fan 3.Top light 4.Roof 5.Control panel 15 WS-609P 19 6.Storage shelf 7.Function shift switch 8.Hot/cold water switch 9.Mirror 10.Handle 11.Handrail 12.Left body glass 13.Nozzle 14.Moveable shower 15.Shower chain 16.Elevating holder 17.Soap box 18.Right body glass 19.Room body WS-609P 02 ATTENTION 22 23 24 25 26 27 30 31 32 33 34 28 29 22.Bathtub 23.Waterfall switch 24.Water jet(6PC) 25.Pillow 26.Nozzle 27.Drainage 28.Drainage switch 29.Marble INSTALLATION SKETCH 30.Air switch to open water pump 31.Air adjuster to strength jets water 32.Steam outlet 33.Recycle net 34.Waterfall 1.In order to be tripped and fell down, pay more attention when get into the steam room. Please don't shut the finger in the door in order to be hurt. 2.In order to avoid damaging the surface of products please do not use hardness and sharpness tool to curve the products. 3.In order to course fire, no smoking inside the bathroom. 4.the jets of steam and drainage pipe both are high temperature when products working, in order to be hurt please be careful. 5.In order to be tripped and fell down please keep clear of the bathtub after taking shower each time. 6.It will be leaking if the glass glue plastic sheet be off then please add some more for recover. 7.If there are marks of water please clear with soft cloth and toothpaste. 8.In order to be blocked of drainage device please keep clean of the surface of bathtub. 9.Please do not hang up heavy things on the steam room or the handle of steam room. 10.Please deal with the products according to the local laws when it is no longer be use. ATTENTION FOR USAGE 1、check if power and cold/hot water switch be turn on or be turn off each time before use this product. 2、check if power of electronic leakage device be get through or not. Checking way: Press testing button, light of power be off, press button of restart then light of power be on.It is not being what mentioned above after operated step by step,then that shows the electronic protection device out off control or there is something wrong with the electronic leakage device,so should ask professional to check and maintain the product. 3、 Turn off the main power of control panel after stop usage. The plug of power should be pull out because only turn off all the functions of control panel that is not stop the power. 4、 People with hypertension or drunk are not allowed to have sauna steam bath. 5、 Children should have sauna steam bath under adult's instruction. 6、 Please don't shut the finger in the door in order to be hurt when get into the steam room. 1300*1300*2200MM 51.2”*51.2”*86.6” 03 WS-609P 7、 In order to be tripped and fell down, pay more attention when get into the steam room. 8、 keep clean of the tray in order to be tripped and fell down. 9、Pay attention to the steam sprayer and water tank drainage, they are in high temperature while working. WS-609P 14 Notes Attention: The machine must be fixed in the circuit which protected by creepage protectionand should be well-connected with the ground. Nontechnical people can not be fixed or removed at random. 1 . Install the steam bathroom in a proper way and have the electrician or professional personnel to install the unit , the company won ' t take the responsibility for any improper installation and usage . Cold water pipe Hot water pipe 2.The application of the product shall observe the operating instructions, dismantling and alteration without authorization is prohibited, the manufacturer shall not take the responsibility for any problems resulted from improper use or dismantling by one ' s self. Please follow the steps to install the unit. INSTALLATION PROCESS Strip A Strip B 1 . A s se mb l y o f tr a y i f th e gr o un d i s no t s mo o th , p l ea s e a d ju st t he n ai l un de r th e tr a y t o k e ep t he b al an c e o f t he t ra y an d gr ou n d . P le a se ta k e o u t t h e s te a m p ip e in t hi s st e p . Drain St ep 1 13 WS-609P WS-609P 04 2 . P ls . pu t le ft a nd r ig ht b lu e c le ar f ix e d g la s s d oo r on a s of t t a bl e . P ls . pa y at te n ti on t o t he i r d i re ct i on on t he t ab le . Do no t pu t th e fi xe d do or o n h ar d t a bl e , o r th e g l as s w i ll b e d am a ge d . S t ep 2 S t ep 3 3 . P ls . lo c k b ot t om a lu mi n um f ra me & le ft f ix ed g la s s t og e th er b y s cr ew s , n e xt lo c k b ot t om a lu mi n um f ra me & ri gh t f ix ed g la s s t og e th er i n t he sa m e w a y . Ne x t , p ls . l oc k t o p a l um in u m f ra m e a nd le f t , r ig ht f ix e d g la ss d oo r to ge t he r . P ls . p ay at t en t io n t o th e d et ai l ed p ic tu r e . Af t er t ha t , p ls . st an d th e ha lf f in is h ed f ro nt g la ss p an el . Step 4 Strip A 05 05 WS-609P M 4× 2 0 M 4× 2 0 4 . I ns t al l st ri p & m ag ne t ic s tr ip o n l ef t & r ig ht s id e of th e bl u e c le ar m ov a bl e g l as s , a ls o l oc k w h ee l s o n i t s up & b ot to m si d e . Do n ot t ig ht e n t h e w he e ls to o c lo se i n t h is st e p . P ut t he mo v ab l e d oo r on f ro nt g la ss p an e l b y p u tt in g i ts wh e el s on al u mi nu m r ai ls . Tr y pu sh a nd p ul l t he mo v ab l e d oo r , a nd a dj us t it s ti gh t ne ss o f t he pu l le y to ma k e t h e d oo r r u n w e ll . F i na ll y , t ig ht e n t h e w he e ls of t he Strip B m ov ab l e d o or & i n st al l d oo r h a nd l es on m ov ab l e d oo r . (1) The electrical pitch Press pitch can open the machine, the temperature is the room temperature.The time will show 30m. At the same time, it will open the ceiling lamp.Press again will close all the functions. (After the closure of the machine, the water case will drainfor 2 minutes) (2) The application of the back lamp Press ,the sidelight is on. Press again, the ceiling lamp is out, press a third press, the sidelight is out too. 3) The steam function Press ,startup the steam function, the water case will pump water automati-cally. After 60minutes or so, it will generate steam. (When the water case is lack ofwater, the controller will replenish automatically) (4) The air draft function Under the condition of turnning on, press can start up air draft function, pressagain will colse it. (5) The setting of time or temperature 1. Press pitch can adjust the time from 1-99. 2. Press pitch can adjust the temperature from 30-60 . WS-609P 12 M6 ×35 1 4 2 5 3 6 5 . L o ck le f t & r ig h t b lu e co at e d g l as s an d a cr y li c p a ne l to g et he r b y s c re ws . In s ta l l s pa r e p ar t s o n th e b ac k si de b od y , t h ey a re g la ss h an d ra i l , t ow e l h an d ra i l , s oa p b ox & sh o we r . C ar r y t h e s te a m r oo m ba c ks i de b od y to t he t op o f b ot t om tu b . St ep 5 7 8 1 Time adjustment pitch+ 5 Temperature adjustment pitch- 2 Temperature adjustment pitch+ 6 Fan Pitch 3 CeilingLamp/Back Lamp pitch 4 Time adjustment pitch- 11 WS-609P 7 8 8 - ST 4×1 2 6 . P l s . ca r ry t he f ro n t s id e gl as s bo d y t o th e t op o f b a th tu b , an d l oc k sc re w s o n t he a lu m in um p ol e s f r om f ix e d d oo r & ba ck s id e b lu e co at e d g l as s . T he n th e fr on t & b ac k si de b od y fi x ed t og e th er . Steam Pitch Main Cock Pitch S te p 6 WS-609P 06 8 - S T 4×1 2 7 . P e r t he r e ad y s cr e w h ol e s , pl s . fi x t he w ho l e s te a m ro o m bo d y on t he b a t ht u b . Drawing of water connection Top shower Function shift switch S t ep 7 Hand shower Cold/hot water switch 8 -M 6× 25 3 - S T 4×1 2 8 . P u t t he t o p o n t he s te a m r oo m b od y, an d t he n l o ck t h e s c r ew s o n r ea d y s cr e w ho l es o n t op . . Water fall Nozzle 07 WS-609P Step 8 Steam generator WS-609P 10 DRAWING OF ELECTRICITY CONNECTION clean system steam outlet water inlet P ower OK 9 . Pl s . put gl as s gl ue on f ix ed doo r b ot tom ou tsi de & in si de and in si de t op par t . . Control panel 10 . F in ish ca bl e & w at er p ip e c onn ec ti on . ( p ls . ki nd ly ch ec k t he a tt ac hed pi ct ure ). Fa n L igh t (AC 12V) ( D C1 2V ) 09 WS-609P WS-609P 08