Download ECOS User Manual

Transcript
Figure 6-45
NOTE: If the user has stated that two funding sources cannot be used within the same job under the
program admin > funding sources screen—i.e. DOE and ARRA—then ECOS will not allow the
user to save and display a message stating “There are tasks that are using conflicting funding
sources. Please change the funding sources before saving”:
Figure 6-46
171 | P a g e