Download FCS SmarTEST ONE Manual
Transcript
SmarTEST X User Manual STOX-2007-00-00 PID controller Playback Pre-trigger time Pseudo controller Pseudo monitoring channel Text book PID controller using any analogue in and output for command and feedback. Using the playback feature, the data of a measured data file can serve as a command signal. RPC III in and output is available as option. The amount of time, specified in seconds, minutes, or hours that will be stored before the storage trigger. The pre-trigger time and the recording time determine the duration of the storage. The recording time is the amount of time that will be stored after the storage trigger. A controller that is primarily used to generate intermediate setpoints. Hence this controller has no direct link to an actuator. It serves as a setpoint generator of which the output can act as one of the inputs, for the final command signal calculation, of other control channels. The pseudo monitoring channel can perform various calculations on sampled data of the analogue input boards, ranging from addition of the inputs to table interpolation. The results of these calculations can be monitored by means of graphics Q R Random waveform file Rate Limit Active Reference value Rest condition Ring buffers A.k.a sample data file. A data file of which the points are interconnected by a straight line to form the command signal of a control channel. The term random refers to the contents of the data file, which are not known in advance. An indicator light on the VGA display of the SmarTEST X indicates if the rate limiter is active. In factor control the setpoint is defined as a factor (decimal number) times a reference value. Often the design load is a convenient choice for the reference value. Factor control is primarily meant for static testing. The condition number with tag “rest condition” contains the setpoints to which the system will make a transition at the end of a shutdown sequence. A ring buffer is a time trace of the last N seconds of a certain SCU signal. By default, every control channel that has an SCU controller has three ring buffers, force, displacement, and command. In the case of an unexpected shutdown of the test, these ring buffers can be analyzed to get information about possible clues that can have caused the shutdown. The pre-trigger – and post-trigger recording times are user definable. S Safety monitoring Shutdown Single channel control Slew rate The safety monitoring system is an event-action system. The user can define the conditions, which represent an event, as well as the action, which should follow the occurrence of this event. The default method to depressurize a system will be used. If the application requires that certain subsystems have to be deactivated first, the user has to do this manually. Selecting shutdown will initiate the shutdown sequence. In single channel control one or more control channels can make transitions from set-point A to set-point B asynchronously. In contrast to multi channel control, where all control channels will synchronously make the transitions. The required time to make the transition from set-point A to set-point B is automatically calculated by the SmarTEST software. However the user can influence this calculation by setting certain constraints, one of which is the slew rate. The slew rate is the maximum gradient at which a change in force or displacement can be performed. The other constraints are the group minimum instruction time of a control group and the minimum Page 165 of 168 All rights reserved. Disclosure to third parties of this document or STOX-2007-00-00 User Manual v1.8 (iss3_DRAFT).doc any part thereof, or the use of any information contained therein for Issue no.:3 Sept 15, 2007 purposes other than provided for this document, is not permitted, except with prior and express written permission. Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com