Download LiAM User`s Manual
Transcript
LiAM User’s Manual Safety and Installation 3) connect the current output terminals to the supplied; magnet to be Figure 9: output connections to load 4) handle out and connect the three-phase line inputs to the power supply (ENSURE THAT THE CONNECTION TO THE WALL AC THREE-PHASE MAINS IS NOT ACTIVE AND POWER CANNOT BE DRAWN). Figure 10: connection of line phases L1, L2 and L3 (unplug wall AC mains before executing this operation) 21