Download Subscription Advantage Pack
Transcript
Export Product Hierarchy to Microsoft Project Introduction This feature allows you to export to a Microsoft Project file that can be used for scheduling and for simulation inside Navisworks. Each assembly becomes a task with an estimated duration of 1 day. Assemblies that have subassemblies become summary tasks. User Defined Attributes assigned to assemblies are also exported up to a limit of ten. If you don’t know the name of the product hierarchy or mistype it, the list of product hierarchies will be listed on the command line. If the product hierarchy has a space in the name then you need to surround the name in double quotes (Eg. “MY PH”). Optionally you can create a default schedule or not. Project with Default Schedule