Download User`s Guide: Chromeleon Operational
Transcript
Dionex IC System OQ/PQ User’s Guide with DI water for 20 minutes. The latter is recommended for new systems being qualified for the first time. ICS-1000, 1500 and 2000 systems ship with pre-rinsed tubing, it is not necessary to carry out this step with these systems. 32. CONDUCTIVITY OR ABSORBANCE: Pipette the standards from the standards kit ampoules directly into autosampler vials and place them in the position / order according to the table below. For the Injector Precision and Carry Over standards (AS40 Autosampler only) transfer the Injector Precision standards prepared in Section 2.3 into six autosampler vials and the Carry Over standard (Absorbance detectors only) into one autosampler vial. To qualify an IC system without an autosampler, use the AS40 table for the injection order and inject the samples directly from the standards kit ampoules. 33. ICS-3000 INTEGRATED AMPEROMETRY: Cut the label off the vials (included in the ICS-3000 ED qualification kit) and place the vial directly into autosampler in the position order according to the table below. Note that even though the main portion of the label has been cut off, the concentration marker is still adhered to the label. 34. For systems using an EG40, EG50, ICS-2000, ICS-3000 EG: a. Disconnect the Eluent Generator Cartridge cable from the Eluent Generator EGC connector. b. If installed, disconnect the CR-TC cable from the CR-TC connector. c. Plug the EG/AES/SRS Supply Input cable (4-pin connector) on the IC Validation/Test Box into the Eluent Generator EGC connector. EG40 users will need to use an EG40 Adaptor Cable (P/N 057899). Note: This test requires the IC Validation/Test Box. EG Validation Test Cells are no longer supported for OQ/PQ qualifications. d. Turn on the ammeter or multimeter and set the display to mA. This test requires mA readings from 0.00 to 220 mA. e. Connect the positive lead of the ammeter to the “EG Internal Load” red post connector on the IC Validation/Test Box. f. Connect the negative lead of the ammeter to the “COM” black post connector on the IC Validation/Test Box. g. For an ICS-3000 with two EGCs configured on one timebase, a EGC sensing plug (Dionex part number 063788)or a second Validation test box with Ammeter (see steps c through f) should be plugged into EGC_2. Failure to make a connection to EGC_2 this will result in “Over Voltage” errors when running the test. The program XQ_EG_DUAL_CURRENT or XQ_ED_EG_DUAL_CURRENT will prompt to switch the EGC_1 and EGC_2 during the run. h. From the Browser in the Dionex Chromatography Management System, go to the Panel directory and select the pump_EluGen_detector panel appropriate for the system being qualified. Go to Control and select the timebase configured with the Eluent Generator to be qualified (for Chromeleon 6.7, click on the “Default Panel Tab set”. i. From the Eluent Generator section of the panel, select the cartridge type to be used. The panel will recognize previously configured KOH and MSA cartridges even though the IC Validation/Test Box is plugged into the cartridge connector. 35. FLUKE 189 MULTIMETER: Install the Fluke 189 multimeter into the timebase to be qualified. The driver for the Fluke 189 multimeter is included with Chromeleon 6.8 or later. Connect the Fluke 189 multimeter to the IC Validation/Test Box as described in step 33 of this section. The 031726-15 OQ PQ Operating Instructions rev 5.11.doc Page 27