Version 1.4 May 09 (Continued from page 20) 13. Pull the casing back another 500mm (or as project specification requires) and add a Bentonite seal of specified thickness. This should comprise pure Bentonite pellets / balls as described above for the base plug. Continue to pull the casing a little at a time whilst adding the Bentonite pellets. Once the borehole is sealed to the specified thickness, check piezometer readings again. ( In a 100mm diameter borehole the 5kg of Geosense Mikolit® Bentonite pellets will produce a seal approximately 500mm long ) 14. Fill the remaining void with Grout as shown in the grouting procedure ( See Section 5.6 ). 15. The piezometer installation is now complete but the initial, in-situ piezometer readings have yet to be recorded. Since the piezometric balance may have been disturbed by the installation operations, a series of piezometer readings may have to be recorded so as to determine when the piezometric balance has re-established. Only then can a true set of in-situ pore pressure readings be recorded. 16. Terminate the installation as specified. It is important to terminate the cable above ground level in a waterproof enclosure or with a waterproof connector. Protect the installation from construction traffic and mark its location with a stake. 21