Download QuakeSat Lessons Learned: Notes from the

Transcript
8.1.4
Meeting and Work Places
It is important early to decide where to meet and work. This is not trivial, since meeting
daily or several times per week may be the only way to keep things moving. (Meeting once
per week is NOT enough). Email is another way to pass information quickly, and the team
should have a “team” email master list so all people can stay informed.
The work area should be large enough, and should have the necessary benches and tools to
allow work to proceed efficiently.
8.2
Schedule and Budget
8.2.1
Long Lead-Time Items
Use of complex or expensive test equipment (thermal-vac chambers, vibration facilities, RF
anechoic chambers) should be lined up in the early stage of the project. Industries and some
universities have these facilities and they may be accessed, but on the owner’s terms and on
their schedules. The project schedule must be flexible to accommodate these constraints.
8.2.2
Resource Constraints and Contingency Planning
With the typical time, resource and budget constraints on a small-scale project like this, it
will be impossible to do everything you would like to do. It will be impossible to remove all
risk, and in fact will still be a high risk venture.
A clear focus on the primary objective and the necessary requirements/capabilities to
achieve that objective are very important.
Flexibility will be key in many areas: flexibility in organization, in scheduling, in people, in
the basic design. Reserves in schedule, budget, and temperament will be required and will
be used.
The ability to keep the team and individuals focused and on track, but also flexible to
changes and refocusing on new priorities will be required.
The most successful projects are the ones that did the best at optimizing the above
mentioned items. Sometimes failure in just one area can lead to complete failure of the
project or sometimes the failure will be completely out of your control. However in all cases
the measure by which you and your team met the above mentioned items will define the
highest possible success of the mission.
The schedule of a project is a direct function of the availability of time of its team members,
and the availability of the parts and testing facilities. An inordinate amount of time can be
wasted in waiting for parts or facilities. Good contingency planning can greatly help to
keep the project on schedule. Also, there is an intangible quality that the team requires—the
persistence of the team, and its ability to not take “No” for an answer. Obstacles are meant
to be overcome, and creative solutions may be required to find the answers and to keep on
schedule.
43