8.1.4 Meeting and Work Places It is important early to decide where to meet and work. This is not trivial, since meeting daily or several times per week may be the only way to keep things moving. (Meeting once per week is NOT enough). Email is another way to pass information quickly, and the team should have a “team” email master list so all people can stay informed. The work area should be large enough, and should have the necessary benches and tools to allow work to proceed efficiently. 8.2 Schedule and Budget 8.2.1 Long Lead-Time Items Use of complex or expensive test equipment (thermal-vac chambers, vibration facilities, RF anechoic chambers) should be lined up in the early stage of the project. Industries and some universities have these facilities and they may be accessed, but on the owner’s terms and on their schedules. The project schedule must be flexible to accommodate these constraints. 8.2.2 Resource Constraints and Contingency Planning With the typical time, resource and budget constraints on a small-scale project like this, it will be impossible to do everything you would like to do. It will be impossible to remove all risk, and in fact will still be a high risk venture. A clear focus on the primary objective and the necessary requirements/capabilities to achieve that objective are very important. Flexibility will be key in many areas: flexibility in organization, in scheduling, in people, in the basic design. Reserves in schedule, budget, and temperament will be required and will be used. The ability to keep the team and individuals focused and on track, but also flexible to changes and refocusing on new priorities will be required. The most successful projects are the ones that did the best at optimizing the above mentioned items. Sometimes failure in just one area can lead to complete failure of the project or sometimes the failure will be completely out of your control. However in all cases the measure by which you and your team met the above mentioned items will define the highest possible success of the mission. The schedule of a project is a direct function of the availability of time of its team members, and the availability of the parts and testing facilities. An inordinate amount of time can be wasted in waiting for parts or facilities. Good contingency planning can greatly help to keep the project on schedule. Also, there is an intangible quality that the team requires—the persistence of the team, and its ability to not take “No” for an answer. Obstacles are meant to be overcome, and creative solutions may be required to find the answers and to keep on schedule. 43