Download Details - WBSEDCL
Transcript
WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. (A Govt. of West Bengal Enterprise) Volume II - Technical Specifications for AMI & PLM system 8.4. Transmittals Every document, letter, progress report, change order, and any other written transmissions exchanged between the Contractor and Employer/Consultant shall be assigned a unique transmittal number. The Contractor shall maintain a correspondence index and assign transmittal numbers consecutively for all Contractor documents. Employer will maintain a similar correspondence numbering scheme identifying documents and correspondence that Employer initiates. 8.5. Review Meeting Progress meetings shall be scheduled by the Employer and attended by the Contractor to review progress of the project. Progress meetings shall be used to review the progress, written correspondence exchanged since the last meeting, and open action items. The consultant shall also attend the meeting as and when required by the Employer. The Contractor shall also attend technical meetings as and when required by Employer/consultant to discuss technical aspects of the project and to review Employer/consultant comments on documents. When appropriate, these technical meetings shall be conducted as extensions to the progress meetings. 8.6. Role of Consultant Employer has appointed POWERGRID as consultant for rendering consultancy services for implementation of this Pilot Smart Grid project. No limitations shall be imposed on Employer's involvement of consultants in any activity related to the project. The consultants, at the discretion of the Employer’s project manager, shall participate in project activities and be accorded the same access to the Contractor's facilities as any member of Employer's project team. The involvement of the consultants may include, but shall not be limited to, progress and technical meetings, conference calls, document review, and system testing/validation. Employer shall have the option of adding consultants to the transmittal distribution list to receive all correspondence initiated by the Contractor. Employer shall also have the option of adding consultants to the document distribution list to receive all or selected system documents. The consultants will be bound by the same confidentiality restrictions imposed on Employer personnel. 8.7. Document Review and Approval Rights To ensure that the proposed systems conform to the specific provisions and general intent of the Specification, the Contractor shall submit documentation describing the systems to the Employer for review and approval. The Employer will respond with written comments to the Contractor within thirty (30) calendar days after receipt of the documents. Documents requiring correction must be resubmitted by the Contractor to the Employer within fifteen (15) calendar days. The Employer will respond to resubmitted documents within fifteen (15) calendar days after Section-8: Project Management and Implementation Plan Advisor cum Consultant: Power Grid Corporation of India Ltd. Page 145 of 222