Download 3590E / CPWE
Transcript
E-AF03 1. REQUIREMENTS FOR AN OPTIMAL INSTALLATION To obtain the best results it is recommended to install the indicator and the platform (or transducer) in a place with the following conditions: A flat, level surface on which to rest Stable and vibration free No dust or strong vapours No draughts Make sure the platform is level or that the loading cells are resting evenly Moderate temperature and humidity (15-30°C and 40-70%) Do not install anywhere where there is the risk of explosion All the indicator connections have to be made respecting the rules applicable in the zone and in the installing environment. Respect the recommended electrical precautionary measures described in section 1.1. Make sure that the grounding is made correctly, see section 1.2. Everything not expressly described in this manual has to be considered as improper use of the equipment. Avoid welding with load cells installed. Use waterproof sheaths and couplings in order to protect the load cell cables. Use a waterproof junction box to connect the cells. 3