Download ProActive Training Manual (Single User Version)
Transcript
Note: The weather options list can be edited using the List Manager via the “Weather Encountered” list name. Next, you would make an entry in the “Description” field. Note: This is an important entry as you will be effectively naming your test site survey here. Since you will build up a history of test site surveys done on a particular route over time, you might want to develop a naming system for surveys associated with a particular route. As is discussed in Section 10, you will be able to review the details of historical test site surveys associated with a particular route using the “Route Manager”. The “start date” (the date that data were recorded at the first test site on the route) and the “last date” (the date that data were recorded at the last test site on the route), will be posted automatically (as read from the spreadsheet file). Finally, check off the “Include Atmospherics” box if you recorded visual observations data on your test site survey, and, check off the “Current Interruption” box if the rectifier current during your survey was switched On and Off, otherwise, leave this box unchecked. When all of the above entries have been made, you would click on the “Go” button on the above window, which will pull up the “Route Data Entry” window shown below. 343
Related documents
“GATHERER ONE” DATA-LOGGER USER`S MANUAL
SE-330 Neutral-Grounding-Resistor Monitor Manual Rev
MeerCAT Pro User Manual
DA METER USER`S MANUAL - The M.C. Miller Company
user`s manual and reference guide
Gx Site Survey Data-logger User`s Manual
RM IV Manual - LinPlug Virtual Instruments
MERLIN Interrupter User Manual
Bedienungsanleitung
User`s Manual XL100 Portable Data Station
Surface Potential Surveys Training Manual
CIS Training Manual – DA Meter Version