Download ProActive Training Manual (Single User Version)

Transcript
Note: The weather options list can be edited using the List Manager via the
“Weather Encountered” list name.
Next, you would make an entry in the “Description” field. Note: This is an
important entry as you will be effectively naming your test site survey
here. Since you will build up a history of test site surveys done on a
particular route over time, you might want to develop a naming system
for surveys associated with a particular route.
As is discussed in Section 10, you will be able to review the details of
historical test site surveys associated with a particular route using the “Route
Manager”.
The “start date” (the date that data were recorded at the first test site on the
route) and the “last date” (the date that data were recorded at the last test site
on the route), will be posted automatically (as read from the spreadsheet
file).
Finally, check off the “Include Atmospherics” box if you recorded visual
observations data on your test site survey, and, check off the “Current
Interruption” box if the rectifier current during your survey was switched On
and Off, otherwise, leave this box unchecked.
When all of the above entries have been made, you would click on the “Go”
button on the above window, which will pull up the “Route Data Entry”
window shown below.
343