Download Hoist - Towerwork

Transcript
TOWERWORK
When changing pads, replace 10 pads with same
thickness and without greasy dirt..
1.Remove crust1.
2.Measure and make note of the position of adjusting sleeve 6 so that it is refitted in the same position after the pads have
been changed. Measure the moment of brake after changing pads.
3.Unscrew and remove adjusting sleeve 6 and take out brake spring 7.
4.Slacken cable 15,discinnet the 2 plug if necessary.
5.Take out four nuts 12. 6.Remove
end bracket 2.
7.Pull but not take off electromagnet housing 4. 8.Remove old
pads 10 and fit new ones.
9.Push electromagnet housing 4 back along the bolts to that armature 5 comes up against the new pads. 10.Push
back end bracket2 and tighten nuts.
11Refit brake spring 7 and screw in adjusting sleeve 6 to the position to noted point above.
12.Connect the cable.
13.Turn no! Electric power and apply the brake a number if times to check if it works normally. 14.Fit
the crust1.
If the brake can not be released, check:
-- --If the rectifier is in order
-- --If the brake contactor is in order
-- --Measure voltage is via the magnet coil (nom195VDC.). Measure the moment before using (see figure)
TOWERWORK,inc U.S.A. 7 OLD FIELD RD. 11733 NEW YORK
PHONE:+1 516 303 3004 FAX:+1 631 744 0414
Web:www.towerwork.net
N-4