Download Hoist - Towerwork
Transcript
TOWERWORK Safety requirement for installation 1.Clean the erection place and fence it with railings. No admittance except on business. 2.Provide a safety net to prevent anything fall down to the erection place. 3.There must be the person who has specific duty for installation. 4.All parts on the cage must be put steadily and kept within the safety railing. 5.The lifting device only use for installing and dismounting parts and can not be permitted overload. 6.Do not start the cage when the lifting device is being used. 7.The installing persons must put on the safety cap, safety belt, no slide shoes and so on . 8.Before operation ,at first connect protection device of ground connection to metal structure of the hoist R≤4Ω. 9.The number of dynamic system must be in line with cage number. 10.All the parts must be adopted our company's Original copies, or else ,there would be the safety hidden trouble. 11.Without our permission , users can not change the hoist circuitry optionally. Safty lock Grounding device connection diagram 12.No install at night or after drink. 13.Persons' head and hand can not be out of the safety railing when the hoist is operating. TOWERWORK,inc U.S.A. 7 OLD FIELD RD. 11733 NEW YORK PHONE:+1 516 303 3004 FAX:+1 631 744 0414 Web:www.towerwork.net J-2