Download AS2000: The Basics
Transcript
Hardware Installation 2. Insert the positive wire into the RTN socket of the DC input connector, and tighten. 3. Insert the ground wire into GND socket and tighten. 4. Install the fuse when all connections are made. Figure 4-7 Connect the Power Supply Alarm PWR 2940 DC Input Connector Connect the power supply alarm relay contacts from P3 (POWER SUPPLY ALMS) on each Multi-line shelf to the office alarm equipment. Refer to Figure 4-8. Figure 4-8 Power Supply Alarm Relay Contact Wiring NC COM NO NC COM NO NC COM Supply A Alarm NO NC COM NO Supply B Alarm A normally closed (NC) contact, a normally open (NO) contact, and a common (COM) lead are provided for each power supply. Applying power activates the NO and NC contacts. When power to the equipment is lost or a power supply fails, the relay deactivates, forcing the NO contacts closed and the NC contacts open. Connect COM to NC or NO, depending on your office equipment. Torque connector wire set screws to 4.5 to 8.0 inch lb (0.5 Nm to 0.9 Nm). 4-8 Verilink Access System 2000: The Basics