Download 556 Acquisition Interface Module User`s Manual
Transcript
L. Ethernet TDR Test This option performs the 3rd loopback test on the SNIC. The first two are internal tests of the SNIC. This test requires one of the Ethernet ports to be connected to a valid network. The SNIC transmits data out onto the Ethernet network and receives it at the same time. The data received is then compared to that transmitted. The test passes if the data is identical. M. Test ADC The test ADC option tests that the status register of the ADC FPGA for a value of 0 for the overflow bits on channels 1 and 2 and a 0 for the acquisition status for both channels, as well. If this is not the case, the test indicates a failure. N. Test ICB To test the integrity of the ICB FPGA, the status word is read and a test of the enable remote write bit are made. The test passes if and only if this value is a 0. Q. Quit Diagnostics Mode This option will exit from diagnostics mode and return you to the Command Monitor mode. 5.6 Preventive Maintenance Preven tive maintenance is not required for this unit. When needed, the front panel of the unit may be cleaned. Disconnect the unit’s power before cleaning. Use only a soft cloth dampened with warm water and make sure the unit is fully dry before restoring power. Because the NIM wrap is not water tight, do not use liquids to clean any part of the unit. 20