Download SIEMENS
Transcript
SIEMENS With reference to table 4.1, the next example shows the total power calculation. CONSUMPTION Sensor QAG40SS Sensor QAO40SS Relay Module LZY40 Solenoid valve Hooter Signal lamp Buffer Battery Qty. UNIT POWER TOTAL POWER TOTAL CURRENT 3 1 1 1 1 1 1 1,6W 0,7W 2,5W 12W 2W 2W 7W 4,8W 0,7W 2,5W 12W 2W 2W 7W 0,4 0,058 0,208 1 0,166 0,166 0,583 31W 2,581 TOTAL Table 4.3 Power cable cross section will be: S= 2,581/3= 0,860; since the calculated value is lower than 2.5mm² we choose 2,5mm² leads anyway 4.4.2 Extended structure When the loads exceed the maximum Central Unit power (30W) fit an UPS. The following example shows a plant with three boilers, each provided with a gas solenoid valve. Near each boiler there is a methane detector QAG40..: one carbon monoxide detector QAO40.. is sufficient for the whole room. One Display Module is installed at room entrance for status plant control without using the Central Unit. Each methane detector is associated with a Relay Module that, in case of pre-alarm, feeds an acoustic signal, in case of first alarm threshold closes the solenoid valve associated to the boiler and in case of second threshold alarm closes the main gas valve. User Manual - LYC40 Rev.06 September 2001 33 Siemens Building Technologies HVAC Products