Download GX Developer Version7 Operating Manual

Transcript
7 VERIFYING THE PROJECTS
MELSOFT
7 VERIFYING THE PROJECTS
[Setting Purpose]
Verify data between the projects of the same PLC type.
[Operation Procedure]
Choose [Project] [Verify].
REMARK
For details of the operation, refer to "Verifying Data in Projects" of the GX Developer
Version 7 Operating Manual.
Executing project verify displays the verify results of the following items.
(1) Parameters
(2) Labels + FB programs
(3) Actual programs
The following are the display examples of verify results.
(a) Verify results: When the results are OK
7
(b) Verify results: When the results are not good
172
173
7-1
7-1