The HBV model
Routing routine
Transformation function
The generated runoff of one time step is distributed on the following
days using one free parameter, MAXBAS, which determines the
base in a equilateral triangular weighting function.
runoff before
transformation
runoff after
transformation
Runoff
Weight
0.4
0.2
0.0
1
2
3
4
5
0
5
Time [d]
10
15
20
Time [d]
Figure 15. Example for a transformation with MAXBAS=5
12
Q [mm/day]
9
MAXBAS = 2 days
MAXBAS = 5 days
6
3
0
Mar
Apr
May
Jun
Jul
Figure 16. Example of simulations with different values for MAXBAS, thick line:
MAXBAS=2 days, thin line: MAXBAS=5 days
Jan Seibert
Stockholm University