Download User Manual

Transcript
15-2
Complete Solutions
independently of the mains, the case has enough room for special signal connections,
a panel with electrically isolating measurement transformers or special signal
circuitry.
The application areas include mobile measurement acquisition, fault finding, plant
monitoring and on-site component tests. When used in automobiles or trucks the
PCMCIA cable can be extended up to 4.00 m, so that the RoadTop case can, for
instance, be housed in the boot while the notebook PC is installed near to the driver.
Depending on the application, cases of various sizes offering two, three or four 16bit ISA slots are available.
A choice of BNC, Phoenix terminals or banana plugs may be provided on an
interface panel at the side, or on external signal connection terminals. The signal
connections of your choice are fitted in our in-house electronic workshop.
15.2.
Test Stations
When choosing ARGUS components for test stations it is of great importance to
select the correct signal connections. In addition to electrically isolating
measurement transformers, PROFIBUS and CAN Bus components are used for
digital and analogue inputs and outputs. It is also possible for measuring instruments
with serial ports to be integrated into the ARGUS environment. SORCUS would be
glad to help you make your choice.
We will, of course, provide you with a full and binding quotation. If you wish, we
can carry out the wiring, commissioning, switch cabinet assembly and test operation
of your test station, as well as connecting to systems from other manufacturers.
We implement special software adaptations based on a performance specification,
including function guarantees for the whole test station.
15.3.
Stationary and Network-Supported Measuring Systems
Extensive measuring systems with hundreds of analogue and digital inputs, and
including, if desired, switch cabinets, signal connection terminals, cabling, assembly
and commissioning can be supplied. For network-supported systems we can, of
course, handle the construction of the network, selection of the server, setting up the
network and installing all the measuring stations up to full operational readiness.