Download User Manual
Transcript
CS50 series withstanding voltage& insulation manual 2. Changsheng Instrument Back panel instruction (CS5051series) 2.1 Power socket/fuse holder Pull out power supply before replacing the fuse 2.2 GND terminal Make sure the instrument a good ground. 2.3 PLC interface Remote grouding terminal is accompanied by in the back of tester, which can be connected to the remote controller to process operation. And this terminal is standard 9PIN D terminal blocks, which has the following signals, reset signal, testing signal, qualified test signal ,and failed test signal, signal in the process of testing Page 21 of 35