Download V-Series Dobby Loom User`s Manual
Transcript
V-SERIES - LOOM ASSEMBLY 8) Push down on the end of the brake pedal so that you can attach the spring to the same bolt. You’ll have both the tie-up and the spring on the bolt. 9) Push the bolt back through the pedal and replace the nut. 10) Hook the loop at one end of the cable on the proper J-bolt. Bring the cable immediately up and around the exterior side of the Brake Drum. Wrap it around the Brake Drum; it will pass over the top of the drum three times. Take care not to cross the cable on itself. 11) When you’ve just enough cable remaining to almost reach the brake pedal, collect the three loops of the cord into the snap hook. 12) Check again to make sure the cable isn’t crossed on itself. 13) Use the toggle on the tie-up to adjust the tension on the pedal. To increase tension, pull the two ends of cord away from the toggle (as shown in Figure 3-20). To decrease the tension, squeeze the buttons on either side of the toggle and move it up and down on the looped ends. INSTALL THE SHELF Page 3-32 You’re nearly finished! – it’s time to install the shelf. 1) Orient the shelf so that the felt strips on the bottom will lay atop the three sets of Harness Pulleys when the shelf is in place. These act as Cable Retainers and will keep your Harness Cables properly located during lifting of the harnesses. 2) Slide the shelf into the grooves in the Harness Pulley Supports. 3) Insert the retention pin into its hole. It will, and should be, tight. It will loosen over time. 4) If you cannot push the pin all the way into the shelf, check that you haven’t put the shelf in backwards.