Download AQUA-METRE D100 User Manual

Transcript
P.L.S.M. ( www.plsm-instrumentation.com )
2.3 Base activation
The Base and the interferometric frame being assembled, brought them down and lock the
Base on the mast head using the dedicated locking screw:
Locking screw
Then switch the Base on (half turn with the Base contactor), the red light will flash for 0.5
second. The Base initialisation and calibration will then occur.
Important:
The diver must then offset from at least 2 meters from the Base in order to avoid any
noise interference when the Base perform the calibration and especially the
calibration of sound celerity.
The base will be ready for first measurement 45 seconds up to 1.5 minute after switch on, if
one of the Pointer in the list is present and switched on, it will then receive incoming
coordinates. If there is no activity 2 minutes after the Base switch on, then go to the Base
and check the light status. If the red light only flashes, then try to switch it off then on again
and wait for another 2 minutes. If the error occurs again, then stop the Dive and bring the
system up for checking (see chapter 4 for failure identification and contact PLSM or your
distributor).
The Base autonomy is greater than 8 hours when fully charged and working with at least one
Pointer (if there is no active Pointer, then the interrogation rate of the Base will decrease in
order to save batteries charge).
AQUA-METRE D100
User manual
page 28
P/N 0100-900-106