Download User`s Guide for OPTIC 2
Transcript
Optic 2 Issue 1 _______________________________________________ When leak testing connections, ensure that a suitable electronic leak detector, (such as the Ai Leakseaker 196), or a 50/50 solution of iso-propanol and water is used. Under no circumstances should a soap solution or similar be used. The injector control box must not be switched on with the injector disconnected. Serious damage to the instrument may be caused. _______________________________________________ Page 1.2 Warnings and Cautions