Download NAVEDTRA 14342 Air Traffic Controller

Transcript
Facility Logs, Manuals, and Reports, Continued
Air traffic
activity report
(continued)
The air traffic activity report has the following three parts:
The control tower operations count
The approach control operations count
The special use airspace operations count
Reports of air activity are required by CNO to assist in administration and
manning and to support the operational costs of the ATC program ashore.
The air traffic activity report accounts for a facility's ATC operations for an
entire calendar year and is closed-out on 31 December. This report is
required to be submitted annually on 1 January to reach CNO (N885F) within
30 days of the due date. The facility must send copies to appropriate type
commanders, ATC representatives, NISE East (Code 313), and NAVREPs.
To properly fill out the report, you need to know how to count each aircraft
operation. The traffic count procedures are outlined in NATOPS Air Traffic
Control Facilities Manual, NAVAIR 00-80T-114. Included in the report are
aircraft operations, radar approaches, PALS approaches (where applicable),
and items that, in the judgment of the originator, would be of interest to the
report addressees. You must also report air traffic control training device
usage.
Biennial
terminal
instrument
approach
procedures
report
Commanding officers of Navy aviation shore facilities are required to review
terminal instrument approach and departure procedure requirements for their
facility biennially. They do the review in conformance with United States
Standard for Terminal Instrument Procedures (TERPS), OPNAVINST
3722.16, and NATOPS Air Traffic Control Facilities Manual, NAVAIR 0080T-114.
Reports of this review are submitted to Naval Flight Inspection Group
(NAVFIG) in accordance with the following instructions:
If no changes have occurred, submit a statement that the currently
approved procedures are necessary, operationally suitable, and
conform with the provisions of TERPS
Continued on next page
12-E-4