Download 10500 Installation Guide

Transcript
Figure 7 Install the cage nuts (S10508)
1
1
1
1
1
1: Cage nuts
NOTE:
When preparing for installation, make sure that the total height of the switches to be installed is no higher
than the height of the cabinet, and reserve enough clearance for cable routing.
Installing accessories to the chassis
Installing mounting brackets and cable management brackets
Before installing the switch to the cabinet, install the mounting brackets and cable management brackets
shipped with the switch. Mounting brackets are used for fixing the chassis to the cabinet, and cable
management brackets (signal cable and power cable management brackets) for cabling the switch.
•
S10508-V: Install the mounting brackets and cable management brackets separately to the chassis.
For more information, see “Installing the cable management brackets” and “Installing the mounting
brackets.”
•
S10508: Install the power cable management brackets to the chassis. The installation procedures
are the same as S10508-V. The signal cable management brackets have been installed to the
mounting brackets when the switch was shipped. For how to install the mounting brackets, see
“Installing the mounting brackets.”
•
S10504: The power cable management brackets are installed on the chassis. For how install the
power cable management brackets, see “Installing the cable management brackets.” The signal
cable management brackets have been installed to the mounting brackets when the switch was
shipped. For how to install the mounting brackets, see “Installing the mounting brackets.”
13