Download SIGNALLING SYSTEMS
Transcript
69 RATO 6 / 05-2012 6.3.5.2 Releasing a main route A set main route must be released automatically as the track sections on the route become occupied and vacant according to the occupancy sequence of the route. The signal included in the main route must be controlled to display a 'Stop' aspect before lockings of the route are released. The route locking of a main route track section must be released, when the track section in question and the previous track section have become occupied and vacant and the track section following has become occupied according to the occupancy sequence corresponding with the main route direction. The route locking of a main route track section may not be released, if the first one of consecutive track sections becomes vacant before the latter track section becomes occupied. The route locking of the track sections of the track in rear of the main route exit signal or the track section ending a main route must be released when the track section in question becomes occupied and the route locking of the previous track section is released, if the track section is not associated with other lockable signalling elements controlled by the interlocking system. The route locking of the track in rear of the route exit signal or the track section ending a main route must be released when the track section in question becomes occupied and vacant, the following track section becomes occupied and the route locking of the previous track section is released, if the track section is associated with other lockable signalling elements controlled by the interlocking system. The point locking on the route or overlap must be released when the locking of the point track section is released. The flank protection locking of the point providing route flank protection must be released when the locking of the track section, which the point is providing flank protection for, becomes released. The releasing of the main route must also function reliably when a short and fast train is using the main route. A break in the interlocking power supply must not cause the unintentional release of the main route. 6.3.5.3 Cancelling a main route It must be possible to cancel a part of a set main route, if main route setting is interrupted and the main route entry signal is not controlled to display an aspect permitting driving. A set main route can be cancelled if the track sections on the signal approach zone that have a route or routes set up to the route entry signal of the main route about to be cancelled are vacant (Figure 6.3:19). ① ② Signal approach zone, where track sections must be vacant ① Set main routes ② Main route about to be cancelled