START-UP AND MAINTENANCE 8-6 Plug holes to compressor manufacturer's specifications. Remove suction and discharge rotolocks. Remove mounting bolts. When moving the compressor, use a come-along, hoist or hydraulic lift to carry the weight. Return to Contents Cleaning the Turba-shed™ Should the Turba-shed require cleaning, first shut down the system. Isolate the Turba-shed and bleed off pressure into an approved recovery vessel. Remove the top and bottom sight glasses and the oil supply line. With a clean, dry, regulated pressure source like nitrogen, blow out any sludge or dirt. Install the sight glasses using new O-rings. Do not use the rack piping or panel to support a hoist or come-along. Parker Number 2-23, Compound557 Precision Rubber, Number 023, Compound 2337 Do not use ceiling trusses to support a hoist or come-along. If a compressor removal table is used, slide the compressor fully on to the table, then roll table to overhead hoist or hydraulic lift area. Install the new compressor in reverse order of removal. Do not open the new compressor to the system until after it has been leak tested and triple evacuated. Check rotation of new compressor (see Page 8-4). September 1, 1997 Leak test, evacuate, and charge with fresh oil (only Suniso 3G or Texaco Capella WF32). Open valves closed to isolate the oil system and bring the rack back on line. Replacing Drier and Filter Cores Shut down the system. Isolate the core to be replaced and bleed off pressure into an approved recovery vessel. Open housing, replace core and close up. Pressurize, leak test and bring back into line. Note: Oil level regulator sight glasses are designed to provide a hermetic seal when internally pressurized. Some leaking may occur when a deep vacuum is pulled. HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 • Printed in USA