Flame safe guard controller with integrated operating, modulating and high Umits safety controls.
Keyboard Display Interface with LCD Panel and 4 button display.
Display provides boiler status including: sequence, lockouts, alerts, set points, controlled
temperature and flame signal.
Alarm and silencer.
Dimensions of the boiler cabinet: 29" width; 34" depth; and 54" height.
Shipping weight of boiler is approximately 1,000 lbs.
Stainless steel jacket.
Safety relief valve.
Electrical voltage requirements: 120 volt/ 1 phase/ 60 Hertz.
Recommend hot water flow rate is 50 GPM.
Pressure drop in the HW Boiler for 50 GPM is only 13 feet of head.
Condensing Kit to store and process condensate.
Circulation Pump is not provided.
Exhaust vent size is 8" ID.
Lead time until delivery is 6 weeks.
Lead times are subject to change and must be verified at time of order entry.
INSTALLATION
Installation services shall include the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Order the replacement Atlas boiler.
Receive the Atlas boiler and provide temporary storage.
Dehver the Atlas boiler to the work site.
Discoimect electrical power from the existing Bryan boiler.
Disconnect water piping from Bryan boiler.
Discoimect the natural gas piping from the Bryan boiler.
Disconnect the exhaust stack from the Bryan boiler.
Remove the Bryan boiler and dispose.
Set the Atlas boiler in place.
Connect the new boiler to the existing stack.
Coimect electrical power to Atlas boiler.
Connect water piping to the Atlas boiler.
Connect natural gas piping to the Atlas boiler.
Commission the Atlas boiler.
Train the customer employee on the operation of the Atlas boiler.
Clean up work site.
PRICE, I T E M 1, EXWORKS F A C T O R Y (Freight Included)
$ 31,421.00