Download installation

Transcript
INSTALLATION
High Voltage Tanks (Check oil level before installing, see Figure 5-1a below).
Figure 5-1a Check Oil Level
Place H.V. tanks on the top equipment shelf, inside the clamps. When facing the front of the
unit, anode tank should be on right side, cathode tank on left side.
1.
Locate ground wires for each tank (yellow/green, yellow/green and purple for anode;
yellow/green and yellow/green for cathode) and securely fasten to ground lug (GND) on
tank with 8/32 kep nut (see figure 5-2, page 7 Sec E).
Page 6 Section E