Download AS20150-180 Serial No
Transcript
DETERMINING FREQUENCY OF REGENERATION After locating and installing the brine tank in the required position, it is necessary to know whether a wet or dry salt system is to be used. This is done by calculation as follows:NOTE: Less salt is required to regenerate a partially exhausted bed per gram of hardness removed, than that required for a more exhausted bed. For economy sake regenerate before full exhaustion. Calculate time between regenerations thus:C ----------- = N HxQ Where C = maximum capacity of unit as grams of CaCO3 (Refer Table 2) H = hardness of water a mg/l or ppm. Q = amount of water passed through the unit in kilolitres per day. N = maximum time between regenerations in days. The calculated value of N should be taken down to the nearest whole number. This is the maximum number of days which can be achieved between regenerations. The amount of salt needed per regeneration, is calculated thus:Total hardness removed (Exchange Capacity Required) = N x H x Q = A Where A = the total hardness removed as grams of CaCO3 The salt dosage for the exchange capacity required is found in Table 2. AS20150-180 Page 5