Download Installation Instructions and User Guide
Transcript
When the valve has been installed with the correct conditions of use it is advised that th subjected to exercise prior to the commissioning at the application temperature. Operat from full cold to full hot at least three times. 1. Record the temperature of the hot The mixed water temperature at the With the the valve at the full cold bringwater the valve to the correct application tempera position and cold supplies. terminal fitting must never exceed turning the spanner clockwise. the valve this temperature, the valv 2.IfRecord theovershoots temperature of the mixedreturn maximum temperature setting for the cold condition, and reset it to the correct temperature +0-2°C. Do not set a valve on a provide water at the operation. largest draw-off flow rate. particular application. Note,temperature It is not as this will not consistent 3. Record the temperature of the mixed possible to install one thermostatic mixing the valve is set to the for the application carry out 5 cold w required watertemperature flow at a smaller draw-off flow valve to supply two differingWhen applications isolation tests to further exercise the valve. rate, which shall be measured. unless the temperature of the higher setting 4. Isolate the cold water supply to the is limited to that of the lower application. Commissioning Test sequence of the mixing monitor the mixed After adjust the temperature mixedvalve waterand in accordance with the valve applicatio out water temperature recording the • Remove the plastic protective cap on top of the carry ( see Table 2) and the following sequence: 1. Record the of the hot and cold water supplies. temperature maximum temperature achieved and the the valve with an allen key. 2. Record the temperature of the mixed water at the largest draw-off flow final stabilised temperature. 3. Record the temperature of the mixed water flow at a smaller draw-off f shall 5. Record the equipment, thermometer etc. • using a close fitting rate, which be measured. used for thetomeasurements. spanner, reduce the thecold water 4. Isolate supply the mixing valve and monitor the mixed the maximum temperature achieved and t Note: Therecording final stabilised temperature should mixed outlet water temperature temperature. temperature byfinal stabilised not exceed the values in Table 3 5. Record the equipment, thermometer etc. used for the measurements. turning clockwise. Note: The final stabilised temperature should not exceed the values in Table3 Table 3 - Maximum mixed water • increase the mixed temperatures Table 3 Maximum mixed water temperatures water outlet temperature by Application Mixed water temperature °C turning Bidet 40 counterclockwise. Shower 43 Washbasin 43 Bath (44°C fill) 46 When the valve has been installed with the Bath (46°C fill) 48 correct conditions of use it is advised that the valve is subjected to exercise prior to the In Service Testing In Service Testing commissioning at the application temperature. Operate the valve from full cold to full hot at The purpose of in-service testing is to regularly monitor and record the performance of The purpose of in-service testing is to regularly least three times. thermostatic mixing valve. Deterioration in performance can indicate the need for servic and record the performance of the work on the valve and/or monitor water supplies. thermostatic mixing valve. Deterioration in With the valve at the full cold position out the test sequence detailed above the same or equivalent equipment use performance canusing indicate the need for service bring the valve to the correct Carry application commissioning the valve. work on the valve and/or water supplies. temperature by turning the spanner clockwise. If the valve overshoots this temperature, Carry out the test sequence detailed above return the valve to the full cold condition, and using the same or equivalent equipment used reset it to the correct temperature +0-2°C. Do for commissioning the valve. not set a valve on a lowered temperature as this will not provide consistent operation. If the mixed water temperature has changed significantly from the previous test results When the valve is set to the required (e.g.>1K), record the change and before temperature for the application carry out 5 re-adjusting the mixed water temperature carry cold water isolation tests to further exercise out the following checks; the valve. • All in-line or integral strainers are clean • Any in-line or integral non-return valves or Commissioning Test sequence other anti-backsiphonage devices are in After adjusting the temperature of the mixed good working order. water in accordance with the valve application • Any isolation valves are fully open. (see Table 2) carry out the following sequence: