Download ReWaRD 2.5 User Manual
Transcript
36 ReWaRD 2.5 User Manual Provided you installed ReWaRD in its default folder, you will find a copy of this worked example in its current state in the folder PROGRAM FILES\GEOCENTRIX\REWARD\2.5\PROJECTS\TUTORIAL 2, under the name STEP2.RWD. Creating the wall Although you could create the wall via the Stockyard’s Create menu or Toolbar as before, instead try double-clicking on the words Retaining Wall in the Stockyard’s Object Types pane. In the dialogue box that appears, select Secant Pile and choose OK. ReWaRD creates a new Secant Pile Wall and displays its property box. Change the wall’s toe depth to 20m and click OK to save the new wall. Then drag the wall onto the Workbook’s Drawing Board. Provided you installed ReWaRD in its default folder, you will find a copy of this worked example in its current state in the folder PROGRAM FILES\GEOCENTRIX\REWARD\2.5\PROJECTS\TUTORIAL 2, under the name STEP3.RWD. Creating a soil column Now it is time to define the soil column at the site. This involves creating three different objects: A soil, to represent the properties of the stiff clay A layer, to represent the geometry and drainage conditions of that soil A borehole, to represent the elevation and ordering of the layers Although you could create the soil by using any of the methods described above, you can speed up the creation of objects still further by using one of the Stockyard’s context menus, as follows: