Chapter 4
Deploying the C65/76M
Deployment and Commissioning Process
Figure 4-6
SNMP Tab in the Network Element Dialog Box
Click the Commission button from the Configuration tab (Figure 4-5) to start the subchassis discovery
process, which allows the C65/76M to determine which modules are installed on the switch or the router
and also allows CEMF to start monitoring the switch or the router.
Note
Commissioning may take a few minutes.
After the Network Element object is commissioned, the Physical view will resemble Figure 4-7.
Figure 4-7
Fully IP-Discovered and Commissioned Catalyst 6513 Switch
Cisco 6500/7600 Series Manager User Guide
4-10